City of Abbotsford, Fraser Valley Regional District - Upper Maclure Road Reservoir

Click on the images to see an enlarged view.
Note: each image will open in a new window; to return to the project page, close the image window after viewing.
 

September 2005  
August 2005  
July 2005
 
 

September 2005

Sept 7

Sept 7

Sept 15

Foundation Footing Slab

Sept 16

Crane installing wall formwork

Sept 16

Sept 22

 

Pouring the west floor slab

Sept 22

Pouring Columns

Sept 27

August 2005

Under wall footing preparation

Aug 10

Installation of under drain pipe

Aug 11

Under slab preparation

Aug 16

Installation of under drain pipe

Aug 16

Outside wall footing forming

Aug 18

Installation of 600mm outlet

Aug 23

Slab-on-grade preparation

Aug 23

Installation of lock block against existing reservoir

Aug 23

Placing under footing mat concrete

Aug 24

Slab-on-grade and footing rebar

Aug 24

 

Aug 25

 

Aug 30

July 2005
New pathway

July 6

Stripping and hauling material off-site

July 13

Stripping and hauling material off-site

July 19

 

Excavation against existing reservoir

July 20

Stripping to get to the design elevation

July 27

 