Under wall footing preparation
Aug 10 |
Installation of under drain pipe
Aug 11 |
Under slab preparation
Aug 16 |
|
 |
 |
 |
|
Installation of under drain pipe
Aug 16 |
Outside wall footing forming
Aug 18 |
Installation of 600mm outlet
Aug 23 |
|
 |
 |
 |
|
Slab-on-grade preparation
Aug 23 |
Installation of lock block against existing
reservoir
Aug 23 |
Placing under footing mat concrete
Aug 24 |
 |
 |
 |
|
Slab-on-grade and footing rebar Aug 24 |
Aug 25 |
Aug 30 |