King County - Brightwater Marine Outfall

Click on the images to see an enlarged view.
Note: each image will open in a new window; to return to the project page, close the image window after viewing.
 

July 2008   


July 2008

floating-HDPE-pipe-small Excavation-installation1-small Excavation-installation2-small

Concrete anchor weight attachment, showing the rubber compensators that allow for expansion of the HDPE pipe under. pressure

July 09

Excavation and Installation of the outfall in the on-shore and near-shore zones is inside sheet piling.

July 09

Excavation and Installation of the outfall in the on-shore and near-shore zones is inside sheet piling.

July 09

 

 

steel-pipe1-small steel-pipe2-small deployment-control-small

84" diameter steel pipe is used for the on-shore burried pipeline.

July 09

84" diameter steel pipe is used for the on-shore burried pipeline.

July 09

Outfall deployment control device.

July 09

Diffuser-part1-small Diffuser-part2-small Concrete-anchor1-small

Diffuser port.

July 09

Diffuser port. 

July 09

Concrete anchor weight on the HDPE outfall.

July 09

floating-HDPE-pipe-small HDPE-installation-small Butt-fasten-small

The HDPE Outfall floating at the Fabrication Site.

July 09

Installation of Concrete Anchor Weights on the 63" HDPE Pipe.

July 09

Butt fusion of the 63" HDPE outfall.

July 09