Project Updates
 Town of Ladysmith
Wastewater Treatment Plant Upgrade - Headworks
May 2009
September 2009
January 2010
June 2010
June 2009
October 2009
February 2010
August 2010
July 2009
November 2009
March 2010
August 2009
December 2009
April 2010
Click on the images to see an enlarged view.
Note: each
image will open in a new window; to return to the project page, close
the image window after viewing.

August 2010
 |
 |
 |
|
West face view |
Pump floor view |
Blower room view |

Back to Top
June 2010
 |
 |
|
|
Bin room |
Structural steel urethane coat - south face view |
|

Back to Top
April 2010
 |
 |
|
|
Foul air scrubber installation |
Checker plate grating installation |
|

Back to Top
March 2010
 |
 |
 |
|
Concrete epoxy coating |
Bridge crane installation |
Finescreen installation |
 |
 |
 |
|
Pump discharge piping installation |
Grit classifier / washer installation |
MCC wiring |

Back to Top
February 2010

Back to Top
January 2010
 |
 |
 |
|
Pump station suspended slab poured |
Structural steel erection |
Pump station bypass / overflow piping |
 |
 |
 |
|
Bin room and MCC room block wall construction |
Influent sanitary sewer installation |
Valve chamber piping |

Back to Top
December 2009
 |
 |
 |
|
Pump station wall formation |
Fine screen slide gates installed |
Pump station suspended slab hatch formation |

Back to Top
November 2009
 |
 |
 |
|
PR1 and PR2 slab on grade rebar |
PR1 and PR2 slab poured |
Upper row soil anchor extension |
 |
|
|
|
PR1 wall formation |
|
|

Back to Top
October 2009
 |
 |
 |
|
Fine screen and grit area channel and wall formation |
Fine screen, grit area channel and wall formation, pump
station wall formation |
PR1 and PR2 chamber foundation |

Back to Top
September 2009
 |
 |
 |
|
Grit chamber formation |
11.50m level suspended slab rebar |
11.50m level suspended slab poured |

Back to Top
August 2009
 |
 |
 |
|
Blower room walls poured |
Pump station excavation |
Pump station foundation |
 |
|
|
|
Pump station slab rebar |
|
|

Back to Top
July 2009
 |
 |
 |
|
Blower room slab foundation |
Blower room slab pour |
Blower room wall formation |
 |
 |
|
|
Upper row soil anchor drilling |
Upper row soil anchor drilling |
|

Back to Top
June 2009
 |
 |
 |
|
Middle row soil anchor drilling |
Lower row soil anchor wall penetrations |
Lean-mix foundation backfill |
 |
|
|
|
Middle row soil anchor drilling |
|
|

Back to Top
May 2009

Back to Top
|