Project Updates

City of Revelstoke
- Revelstoke WWTP Upgrade - Stage 1
(Liner Installation in Lagoon #2)
Click on the images to see an
enlarged view.
Note: each image will
open in a new window; to return to the project page,
close the image
window after viewing.
August 2008
October 2007
September 2007
August 2007

August 2007 |
 |
 |
|
| Lagoon base preparation for liner installation, Aug. 29 |
3/4 minus in as base prep material, Aug. 29 |
|

September 2007 |
 |
 |
 |
| Air testing of seam, Sept. 14 |
Sand bags in place to hold liners, Sept. 14 |
Anchor Trench, Sept. 14 |
 |
 |
 |
Placement of liner, Sept. 14 |
Welder on site, Sept. 14 |
Liner installation in the works, Sept. 14 |
 |
 |
 |
Liner mostly laid out, pipe stub in place, Sept. 19 |
penetration, Sept. 19 |
Welder seaming in progress, Sept 19 |
 |
 |
|
| Welder climbing up the slope, Sept. 19 |
Extrusion welder on site, Sept. 19 |
|
 |
|
October 2007 |
 |
 |
 |
Liner installation completed with new air lines, Oct. 4 |
Outlet structure and pipe, Oct. 4 |
Liner anchor details on outlet structure, Oct. 4 |
|
|
|

Back to Top |
August 2008 |
 |
|
|
Headworks Foundations, Aug. 29 |
|
|
|
|

Back to Top |