City of Revelstoke
- Revelstoke WWTP Upgrade - Stage 1
(Liner Installation in Lagoon #2)
Click on the images to see an
enlarged view.
Note: each image will
open in a new window; to return to the project page,
close the image
window after viewing.
October 2007
September 2007
August 2007

August 2007 |
 |
 |
|
|
Lagoon base preparation for liner installation, Aug. 29 |
3/4 minus in as base prep material, Aug. 29 |
|
|

September 2007 |
 |
 |
 |
|
Air testing of seam, Sept. 14 |
Sand bags in place to hold liners, Sept. 14 |
Anchor Trench, Sept. 14 |
 |
 |
 |
|
Placement of liner, Sept. 14
|
Welder on site, Sept. 14
|
Liner installation in the works, Sept. 14 |
 |
 |
 |
|
Liner mostly
laid out, pipe stub in place,
Sept. 19 |
Pipe
penetration,
Sept. 19 |
Welder
seaming in progress,
Sept 19 |
 |
 |
|
|
Welder
climbing up the slope, Sept. 19 |
Extrusion
welder on site,
Sept. 19 |
|
 |
|
October 2007 |
 |
 |
 |
|
Liner
installation completed with new air lines,
Oct. 4
|
Outlet
structure and pipe, Oct. 4 |
Liner
anchor details on outlet structure,
Oct. 4
|
|
|
|
|