Some of the projects that Dayton & Knight
has
completed in the past are:

City of New Westminster
- Sewer Rehabilitation
Program
Dayton & Knight Ltd. completed the design, tendering, and construction management of a stage of the City's Sewer Rehabilitation Program, which involved 1600m of relining (CIPP and Fold & Form) and 560m of pipe bursting.The City of New Westminster has an annual sewer renewal
program for replacing structurally deteriorated sections of sewer or where
existing sewers require an increase in size to meet future capacity.

City of Abbotsford
- Cyril Sanitary
Trunk Sewer

The City of Abbotsford's Cyril Sanitary Trunk Sewer
Project was the third phase of a trunk sewer program to convey flows from
South Abbotsford to the J.A.M.E.S. Sewage Treatment Plant.
The Cyril trunk section involved 1200m of 750mm and 1050mm
diameter trunk sewer at depths ranging from 5m to 7m.
Dayton & Knight Ltd. completed the work in partnership with B. Cusano
Contracting Ltd. using design/build. The project used a combination of PVC
and HOBAS pipe; the HOBAS pipe was utilized on a 320m tunnelled section
beneath the City’s arterial roads and beneath both the Canadian Pacific
and the Southern Railway tracks.

District of West Vancouver
- Pilot
Area Rehabilitation Program
|
The District of West Vancouver has a pilot program for 37
properties in the Ambleside area.
Pre and post flow monitoring were undertaken at each of the following
phases of rehabilitation work:
-
priority repairs by grouting or spot lining
-
mainline replacement including manholes.
-
service connections by pipe bursting or by sliplining
from the property line to the house.
The images show stages of work at the same location. |

 |


 |
|
 |
 |

For more information on our capabilities and experience
in trenchless technology or other consulting
engineering requirements, please contact:
Jack Lee (jlee@dayton-knight.com), P.Eng. or
Gurjit Sangha (gsangha@dayton-knight.com), P.Eng.